IVRINDI
TÜMAD Mining Inc.
Ivrindi Gold Project
Dates: 2017 - 2019
Location: Ivrindi, Turkey
21,100 TPD - ADR Plant
Ivrindi is a 7.7 million tonne/year heap leach operation with a 3200 m3/hr ADR plant. KCA provided metallurgical flowsheet development, followed by the process sections of a bankable feasibility study.
KCA, together with our Turkish affiliate DAMA Madencilik (Ankara), supplied detailed engineering, fabrication, installation and startup of the plant for the Ivrindi Project located in Turkey, near the town of Ivrindi in the Balikesir province.